Large Load Forecast to 2035 by ISO and Zone
Large load forecast to 2035 for PJM, ERCOT and NYISO. Probability-weighted data center and industrial demand by ISO, zone and year.
The PJM large load forecast, ERCOT large load forecast, and NYISO outlook run to 2035. Annual megawatts are weighted by energization probability and expected timing, by ISO, zone, utility, and substation.
Related large load interconnection pages
Frequently asked questions
- What is a large load interconnection request?
- A request by a large electricity customer, such as a data center, semiconductor fab or hydrogen plant, to connect new demand to the transmission grid, usually 20 MW or more.
- Which grids does the Large Load Monitor cover?
- PJM, ERCOT and NYISO today, covering 1,100+ requests and 260+ GW, with MISO, ISO-NE, CAISO and SPP planned.
- How is energization probability estimated?
- An interpretable model scores each request on study stage, substation headroom, site control and regulatory signals, then weights MW by probability and expected timing.