ISO Load Zones and Large-Load Growth

ISO load zones and large-load growth for PJM, ERCOT and NYISO, with deliverability, fuel mix and queue competition by zone.

Zone pages show where PJM, ERCOT, and NYISO large load growth stacks up against deliverability, fuel mix, and wholesale price shape. Use them with the data center interconnection queue to see which zones are crowded.

Related large load interconnection pages

Frequently asked questions

What is a large load interconnection request?
A request by a large electricity customer, such as a data center, semiconductor fab or hydrogen plant, to connect new demand to the transmission grid, usually 20 MW or more.
Which grids does the Large Load Monitor cover?
PJM, ERCOT and NYISO today, covering 1,100+ requests and 260+ GW, with MISO, ISO-NE, CAISO and SPP planned.
How is energization probability estimated?
An interpretable model scores each request on study stage, substation headroom, site control and regulatory signals, then weights MW by probability and expected timing.