Substation Capacity for Large Loads
Substation capacity for large loads across PJM, ERCOT and NYISO. Hosting headroom, voltage and the data center interconnection queue at each station.
Substation screens cover hosting headroom and voltage for large load interconnection in PJM, ERCOT, and NYISO, linked to the data center requests queued at each station.
Related large load interconnection pages
Frequently asked questions
- What is a large load interconnection request?
- A request by a large electricity customer, such as a data center, semiconductor fab or hydrogen plant, to connect new demand to the transmission grid, usually 20 MW or more.
- Which grids does the Large Load Monitor cover?
- PJM, ERCOT and NYISO today, covering 1,100+ requests and 260+ GW, with MISO, ISO-NE, CAISO and SPP planned.
- How is energization probability estimated?
- An interpretable model scores each request on study stage, substation headroom, site control and regulatory signals, then weights MW by probability and expected timing.