Large Load Energization Probability Model

How the large load energization probability model scores data center interconnection requests on study stage, headroom and site control.

The model scores each large load interconnection request on study stage, substation headroom, site control, and regulatory signals, then weights megawatts by probability and expected timing.

Related large load interconnection pages

Frequently asked questions

What is a large load interconnection request?
A request by a large electricity customer, such as a data center, semiconductor fab or hydrogen plant, to connect new demand to the transmission grid, usually 20 MW or more.
Which grids does the Large Load Monitor cover?
PJM, ERCOT and NYISO today, covering 1,100+ requests and 260+ GW, with MISO, ISO-NE, CAISO and SPP planned.
How is energization probability estimated?
An interpretable model scores each request on study stage, substation headroom, site control and regulatory signals, then weights MW by probability and expected timing.