Sources for the Large Load Interconnection Queue

Primary sources for the large load interconnection queue: PJM, ERCOT and NYISO filings, utility data and the methods behind the forecast.

The source catalog lists the PJM, ERCOT, and NYISO filings and utility publications behind the data center interconnection queue and the large load forecast.

Related large load interconnection pages

Frequently asked questions

What is a large load interconnection request?
A request by a large electricity customer, such as a data center, semiconductor fab or hydrogen plant, to connect new demand to the transmission grid, usually 20 MW or more.
Which grids does the Large Load Monitor cover?
PJM, ERCOT and NYISO today, covering 1,100+ requests and 260+ GW, with MISO, ISO-NE, CAISO and SPP planned.
How is energization probability estimated?
An interpretable model scores each request on study stage, substation headroom, site control and regulatory signals, then weights MW by probability and expected timing.