Data Center Interconnection Queue: PJM, ERCOT, and NYISO
Data center interconnection queue for PJM, ERCOT and NYISO: 1,100+ large load requests, 260+ GW, energization probability and study status.
This is the large load interconnection queue: 1,100+ data center, fab, and industrial requests totaling 260+ GW across PJM, ERCOT, and NYISO. Each row carries an energization probability so headline queue megawatts are not treated as certain load.
Related large load interconnection pages
Frequently asked questions
- What is a large load interconnection request?
- A request by a large electricity customer, such as a data center, semiconductor fab or hydrogen plant, to connect new demand to the transmission grid, usually 20 MW or more.
- Which grids does the Large Load Monitor cover?
- PJM, ERCOT and NYISO today, covering 1,100+ requests and 260+ GW, with MISO, ISO-NE, CAISO and SPP planned.
- How is energization probability estimated?
- An interpretable model scores each request on study stage, substation headroom, site control and regulatory signals, then weights MW by probability and expected timing.