AWS Cumulus @ Susquehanna (960 MW) — PJM Large-Load Queue Dossier | AIxEnergy Monitor

AWS Cumulus @ Susquehanna in PJM (Luzerne County · PPL · Zone PJM_PPL): 960 MW requested, 412 MW expected, 65% energization probability, POI: Susquehanna 500kV / 230kV switchyard (direct generation bus + PPL grid). Live interconnection probability and grid deliverability analysis.

Interconnection Queue Dossier: AWS Cumulus @ Susquehanna

Queue Request ID
16bd0886-4115-4290-a324-a5de74c8b5bd
Grid Operator (ISO/RTO)
PJM
Requested Interconnection Capacity
960 MW
Probability-Weighted Realized Demand
412 MW expected
Energization Probability P(eventual)
65% energization probability
Transmission Utility
PPL
County / Jurisdiction
Luzerne County
Transmission Zone
PJM_PPL
Point of Interconnection (POI)
Susquehanna 500kV / 230kV switchyard (direct generation bus + PPL grid)
Technical Diligence Summary
AWS acquired the 960 MW Cumulus data center campus adjacent to the Susquehanna nuclear power station in Luzerne County, PA from Talen Energy for $650M in March 2024. Following FERC's November 2024 rejection of an amended Interconnection Service Agreement (ISA) to expand behind-the-meter co-location from 300 MW to 480 MW (Docket ER24-2172), capacity expansion above 300 MW is shifting to front-of-meter (FOM) grid interconnection tied to PPL transmission upgrades. In June 2025, Talen and Amazon executed an expanded 1.92 GW carbon-free PPA through 2042, covering both the on-site Cumulus facility and broader AWS Pennsylvania regional data center footprints.

Canonical Dossier URL: https://monitor.aixenergy.io/requests/16bd0886-4115-4290-a324-a5de74c8b5bd · Back to Multi-ISO Interconnection Queue Explorer

What AIxEnergy Large Load Monitor Does

The AIxEnergy Large Load Monitor is an institutional power-grid intelligence platform that reconciles raw ISO/RTO interconnection queues, utility transmission filings, and state regulatory dockets into decision-grade analytics:

  • De-Duplicated Multi-ISO Queue Registry: Tracks 1,100+ large-load applications (AI data centers, semiconductor fabs, hydrogen plants, industrial electrification) totaling 260+ GW across NYISO, PJM, and ERCOT.
  • Interpretable Energization-Probability Model: Scores every request on energization likelihood P(eventual), 24-month and 60-month lead-time distributions, and load-class capacity realization haircuts.
  • Substation & Corridor Headroom Screening: Audits 300+ bulk transmission substations (115 kV to 765 kV) and critical transfer cutsets for transformer headroom and competing queue seniority.
  • Long-Term Demand Forecasts to 2035: Produces annual probability- and timing-weighted MW demand projections by ISO, zone, utility territory, and substation.

Who AIxEnergy Monitor Is Built For

  • Hyperscalers & AI Data Center Developers: Identify viable 100 MW to 1 GW+ points of interconnection (POIs), benchmark competing queue seniority, and compress time-to-power via FlexLoad siting.
  • Electric Utilities & ISO/RTO Transmission Planners: Separate speculative paper queues from funded, high-probability load additions across service territories and transmission zones.
  • Infrastructure Investors, Private Credit Lenders & Advisors: Conduct independent technical due diligence on project energization timelines, utility study milestones, and curtailment exposure.
  • Power Equipment OEMs, EPCs & Energy Regulators: Forecast autotransformer, switchgear, and 345 kV / 500 kV substation upgrade demand and monitor PSC/FERC large-load tariff proceedings.

Pricing & Subscription Tiers

  • Free Preview Tier ($0): Instant browser access to multi-ISO headline KPIs, NYISO overview telemetry, model methodology documentation, and primary source catalog.
  • Institutional Intelligence Seat ($1,500 / seat / month): Full access to all 1,100+ multi-ISO queue dossiers (NYISO, PJM, ERCOT), substation hosting capacity screening, 8,760-hour zonal deliverability profiles, downloadable monthly master PDF reports, and GridKernel MCP / REST API integration.
  • Enterprise Team & Custom Advisory License: Multi-seat enterprise deployment, custom POI due diligence briefings, and direct engineering consultation — Request a Demo.

Request a Live Demo or Institutional Trial

Schedule a 20-minute live walkthrough of the AIxEnergy Large Load Monitor, request sample project due diligence dossiers, or activate an institutional seat ($1,500/seat/month).

Or email bowens@aixenergy.io

Core Platform Navigation & Intelligence Hubs

AIxEnergy Intelligence Suite

  • AIxEnergy Global Project Map — Geospatial infrastructure atlas of 2,800+ global AI data centers, substation capacity headroom, and 30+ grid overlays.
  • AIxEnergy Capital — $697B+ AI data center capital deployment matrix, capex vs. funded MW reality check, and institutional deal studio.
  • AIxEnergy Large Load Monitor — Multi-ISO/RTO interconnection queue tracking (260+ GW) and probability-weighted demand forecasting to 2035.
  • AIxEnergy Journal & Research — Analysis and executive briefings by Brandon N. Owens.

Frequently Asked Questions (FAQ)

What is the AIxEnergy Large Load Monitor?
An analytical intelligence platform tracking significant new electric loads (AI data centers, semiconductor fabs, hydrogen plants, and industrial manufacturing) across North American power grids.
Which ISO/RTO grid regions are currently covered?
Active footprints covering NYISO, PJM, and ERCOT, with over 1,100 requests and 260+ GW of tracked load.
How much does AIxEnergy Monitor cost?
A Free Preview tier ($0) is available immediately in the browser, and full Institutional Intelligence Seats are $1,500/seat/month (or included with an AIxEnergy Enterprise Intelligence subscription).
What is FlexLoad intelligence?
A methodology for evaluating how large loads can energize 2 to 4 years faster using curtailable interconnects and behind-the-meter clean energy.